Western Port Slipway - Melbourne

Slipway into Westernport at Hastings

Crib Point Engineering's slipway facility has the capacity to launch and retrieve vessels up to 60 meters with a weight up to 500 tonnes. The draft of the vessels can be up to 2.8 meters. Crib Points Engineering's facility has no real width restrictions we have slipped barges with more than 18 meters beam in the past. 

Our main boiler shop leads directly onto the slipway making this an ideal location for the construction or repair work of floating plant and boats, as they can be rolled directly in and out of the shop.

View More Images >>>

 

 

 

 

 

 

500 tonne fuel bunker barge built by CPE ready for maiden launch

A Warwick 100 pleasure boat, out for repainting

The Alma Dopel ready to be launched after completely being restored from abandoned state